top of page
Engineering_01_b_w.jpg

Commercial Coffee Machine
Repairs and Servicing

3 Colori works in partnership with Camotek, a South London based commercial coffee machine engineering company who are on hand to help you with any coffee machine repairs or servicing issues. 

Camotek.jpg

FRONT END SERVICE
 

It is advised that this service is to be carried out at least every 8-12 months. This is done on site, the service consists of:

 

  • Replacing Group Head Seals, Group Head Gaskets, Group Head ShowerPlates Steam arm rubbers.

  • Back Flushing Of The Group Head Itself.

  • Basic training on how to clean & maintain the machine, if required.

  • Advice on general condition of the machine and parts & recommend future replacement when necessary.

download.jpg

FULL MACHINE SERVICE
 

It is advised that this service is to be carried out at least every 12 months. This is done off site with a FREE working loan machine provided during the process ( approx. 5-7 days), this service consists of:

 

  • Complete strip down of machine.

  • Full Boiler Descaling Treatment.

  • Replacing Group Head Seals, Group Head Gaskets, Steam Arm Seals, Water Valve Seals, Group Head Shower Plates, Worn rubber valves.

  • Back Flushing Of The Group Head Itself.

  • Scale Removal & Cleaning of Water Ports.

  • Scale Removal & Cleaning of Internal Filters.

  • Cleaning Coils /Descaling Solenoid & Probe.

  • Drink Settings Re-Calibration.

  • Basic training of staff on how to clean & maintain the machine, if required.

  • Advice on condition of the machine and parts & recommend future replacements when necessary.

images.jpg

MAJOR OVERHAUL SERVICE
 

Recommended for any machine never serviced, or left some time between services, always recommended for second hand equipment, or older equipment. This is done off site with a FREE working loan machine +/- grinder provided during the process ( approx. 10-14 days), this service consists of:

 

  • Complete strip down of machine.

  • Full Boiler Descaling Treatment.

  • Replace Group Head Seals.

  • Replace Group Head Gaskets.

  • Replace Steam Arm Seals.

  • Replace Water Valve Seals.

  • Replace Group Head Shower Plates.

  • Replace Anti Vac Valves.

  • Replace Boiler Pressure Safety Valve (Certified).

  • Replace Worn Valve Rubbers.

  • Back Flushing Of The Group Head Itself.

  • Adjust Grinder / Reset Drink Settings If Necessary.

  • Scale Removal & Clean Water Ports.

  • Replace Coils, Solenoid & Probe.

  • Basic training of staff on how to clean & maintain the machine, if required.

  • Advice on condition of the machine and parts & recommend future replacements when necessary.

bottom of page